Public transport and road users in the Rhein-Neckar region are currently affected by construction activities carried out by Rhein-Neckar-Verkehr (rnv). The works lead to temporary changes in routes, diversions, and possible delays across parts of the network.
Due to ongoing construction, certain tram and bus lines are operating on modified routes. Some stops may be closed for the duration of the works, and replacement connections can be offered on alternative streets or at nearby stops. Passengers and drivers should allow extra time for their journeys and pay attention to local signage and service information.
Construction zones can cause traffic slowdowns, particularly near intersections, major stops, and transfer hubs. Public transport services might run at reduced frequency or with adjusted timetables, which can lead to longer waiting times. Local authorities and the operator aim to maintain basic connectivity while ensuring safety for both workers and passengers.
Construction by Rhein-Neckar-Verkehr temporarily changes routes and schedules in the Rhein-Neckar region, so travelers should follow detour information, allow extra time, and consider alternative connections.